Home Start Back Next End
  
137
To
get
to
know
more
of
the
BiN us
JWC
Network
please
see
the
diagram
below
that
shows the rough picture of BiN us JWC Network.
5.1.4.4 Advance Planning & Deployment Scenario
5.1.4.4.1 Standard Operating
Procedure
There
is always standard operation procedure (SOP) for each project that everyone do, by
making SOP, people can get to know more how the process work.
Figure 5.5 explain about the first part of the SOP. First
task
that need to do
is preparing
document for supported product and software, it means the network admin should gather
data about list of software and hardware in BiN us JWC.
Second
step
check
whether
the
product/hardware
support
IPv6
or
not,
if
the
product
is
supported, than continue with enabling the IPv6 in the operating system and checking the
software   compatibility.   After   enabling   IPv6   in   the   operating   system,   network
administrator can set
up the IPv6 address. For the software compatibility
if
the software
is not support network administrator must patch the current software, but if the software
support just enable the IPv6.
Word to PDF Converter | Word to HTML Converter