82
scenario
9,
three
grinding
machine
and
additional
washing
machine
could
produce
3,597
kilograms.
Logically, with an additional
grinding
machine,
it could produce
more products
than scenario 6, but since the pelletization machine capacity only can hold up to 400
kilograms per hour, the raw material will be stalled and needs to queue to be processed.
5.2.2 Throughput time
The  throughput,  the  time  entities  needed  to  be  processed  when  it  first  created  until
disposed. The current manufacture process takes about 2.92 minutes to process the entity.
Table 5.14 Throughput Time - Current Raw Material Used