Home Start Back Next End
  
The current
manufacture
is
not utilizing
machine at
the plant,
since
the process
is piled
up
in the manual washing process as well as the rest of scenario
that
uses the same amount of
material with the current manufacture.
Scenario 6 has an adequate utilization through all machines since the process is flowing
constantly.
The scenario 10
has a better percentage of
machine
utilization, as
it
uses more
material to directly be processed
into plastic pellet. However, the scenario 10 is
most
likely
used
as
an
alternative,
the
Raw
Material
2
is
used
when
a
certain
of
product
needs
to
be
produced.
88
Word to PDF Converter | Word to HTML Converter