Home Start Back Next End
  
26
?
Control:
every  sy st em
needs
a
cont rol,
w
hich
in cludes
makin g
sure  
t
he   goals  
have  
been  
a
chiev ed,  
and  
doing  
sy st em
evaluat ions.
M
ehta,  Riku
(2009)  con cluded 
in
t
he
r
esearch  t hat
in an
informat ion 
sy st em  mer ger 
process, 
t
he  p rimary 
t
arget   should
alw ays
be t he informat ion
sy stems p lanning.
In a comp any
mer ger,
t
here are many  asp ect s t o
manage
t
o
achi eve t he go als;
one of the
most
important  t hings
t
o  mana ge
is
p
lanning
of
t
he  informat ion
syst ems.
2.2. 
IS
Analysi s and De sig n
The  
Syst em  
Analy sis  
and  
D
esign  
in  
sy st ems  
engineering,
informat ion sy stems and soft w are engineerin g, is the process of creating or
alt erin g
sy stems,  and  the
models  and  met hodologi es  t hat  people
use t o
develop   or 
implement 
t
hese  systems. 
The  concept   generally   refers  t o
comput er or informat ion syst ems
(Blanchard&F abry cky , 2006).
2.2. 1. Succe ss Fa ctors i n In formation S ystem s
Implementation
Cleland 
(2010) 
sa id 
t
hat 
t
he 
indicators 
of  a  successful
project
can be genera lly
described
as:
?
The
p
roject  w ork
packages  have
b
een  acco mp lished
on
t
ime
and wit hin
budget .
?
The overall project
result s have be en accomp lished
on t ime and
wit hin budget .
Word to PDF Converter | Word to HTML Converter