Home Start Back Next End
  
28
4.   Pilot
conversion. 
The
new
sy st em
is
fully 
imp lement ed
on
a
pilot
basis
in one segment
of t he organiz at on.
ion.
It    is    said    t hat   
determining    t he    most   
app rop riat e
imp lement ation method
is dep endent
on how
much
t
ime and cost is
avail able,
and how
much risk t he company
is willin g to t ake.
Addit ionally,
stat ed by
G
ary  B.
Shel ly
(2010),
t
his
sy stem
conversion   met hodolo gy  
is 
also 
know n  as  sy st em  changeover.
Sy st em
changeover  is
the
process
of
put ting t he new
informat ion
syst em online and r et iring the old
sy st em. Changeov er c an be r apid
or
slow  depending
, depending
on t he m ethod.
Below
t
he
syst em
changeover
exp lanat on
ion
is e xp ressed in a dia gram :
Fi gu re 2–2 S yste m Ch ange ove r Meth ods
Word to PDF Converter | Word to HTML Converter