21
3.
Motion
Muda of motion, walking due to location of materials and works
4.
Wait
Muda due to idle time, usually due to waiting for
machine to complete
cycle, material not delivered on time etc..
5.
Over-processing
Muda due to over- processing ahead of required, this is very visual when
inventory piling up long before it needed for next process.
6.
Over-production
Muda due to over- producing, hence the inventory of final stock goes up,
it needs additional space to store them, and it make tracing of stock and
quality very difficult
7.
Defect
Muda due to producing defect, if this is not eliminated, the cost will go
up because of wastage in materials, process labour
and the labour to
repair and tracking.
Terjemahan:
1.
Transportasi
Pemborosan dalam transportasi yang berkaitan dengan barang bawaan
dan jarak tempuh.
2.
Persediaan
Pemborosan dari sisa stok barang yang dikarenakan oleh pengiriman
yang tidak tepat waktu, lelet, waktu proses yang lama dan produksi yang
berlebihan.
3.
Gerakan
Pemborosan dari gerakan, gerakan menuju lokasi dari bahan-bahan
dan
pekerjaan.
4.
Menunggu
Pemborosan waktu, biasanya menunggu mesin selesai bekerja, bahan-
bahan tidak terkirim tepat waktu, dan lain-lain.
5.
Proses Berlebih
Pemborosan karena proses yang memakan waktu lebih lama dari yang
dibutuhkan, hal ini bisa dilihat ketika peralatan yang dibutuhkan untuk
proses selanjutnya tidak tersusun rapi.
6.
Produksi Berlebih
Pemborosan karena produksi yang berlebihan, jika stok berlebihan, maka
dibutuhkan tempat ekstra untuk menyimpannya, dan hal itu membuat
pengecekan stok dan kualitasnya menjadi lebih sulit.
7.
Kerusakan / Cacat
Pemborosan yang disebabkan membuat produk cacat, jika ini tidak
diselesaikan, biaya akan meningkat karena banyak bahan -bahan yang
terbuang, tenaga kerja untuk perbaikan dan proses.
|